Print

Pembangunan Semula Prosidur Hidrologi No.1 (HP1) - Estimation Of Design Rainstorm In Peninsular Malaysia

on . Posted in Consultation

Status: Ongoing

Customer: Department of Irrigation and Drainage

Project Details:
The main aim of reviewing and updating the procedure are mainly to overcome the following issues: